Follow
Yu-Yan Han
Yu-Yan Han
School of Information and Electrical Engineering, China University of Mining and Technology
Verified email at cumt.edu.cn
Title
Cited by
Cited by
Year
A review on swarm intelligence and evolutionary algorithms for solving flexible job shop scheduling problems
K Gao, Z Cao, L Zhang, Z Chen, Y Han, Q Pan
IEEE/CAA Journal of Automatica Sinica 6 (4), 904-916, 2019
4042019
Efficient multi-objective optimization algorithm for hybrid flow shop scheduling problems with setup energy consumptions
J Li, H Sang, Y Han, C Wang, K Gao
Journal of Cleaner Production 181, 584-598, 2018
2612018
Evolutionary multiobjective blocking lot-streaming flow shop scheduling with machine breakdowns
Y Han, D Gong, Y Jin, Q Pan
IEEE transactions on cybernetics 49 (1), 184-197, 2017
1822017
A novel hybrid multi-objective artificial bee colony algorithm for blocking lot-streaming flow shop scheduling problems
D Gong, Y Han, J Sun
Knowledge-Based Systems 148, 115-130, 2018
1652018
Hybrid artificial bee colony algorithm for a parallel batching distributed flow-shop problem with deteriorating jobs
JQ Li, MX Song, L Wang, PY Duan, YY Han, HY Sang, QK Pan
IEEE transactions on cybernetics 50 (6), 2425-2439, 2019
1592019
Effective invasive weed optimization algorithms for distributed assembly permutation flowshop problem with total flowtime criterion
HY Sang, QK Pan, JQ Li, P Wang, YY Han, KZ Gao, P Duan
Swarm and evolutionary computation 44, 64-73, 2019
1232019
A discrete artificial bee colony algorithm incorporating differential evolution for flow shop scheduling problem with blocking
YYHD Gong
Engineering Optimization, 2014
1152014
Discrete evolutionary multi-objective optimization for energy-efficient blocking flow shop scheduling with setup time
Y Han, J Li, H Sang, Y Liu, K Gao, Q Pan
Applied Soft Computing 93, 106343, 2020
1022020
Distributed flow shop scheduling with sequence-dependent setup times using an improved iterated greedy algorithm
X Han, Y Han, Q Chen, J Li, H Sang, Y Liu, Q Pan, Y Nojima
Complex System Modeling and Simulation 1 (3), 198-217, 2021
962021
Evolutionary multi-objective blocking lot-streaming flow shop scheduling with interval processing time
Y Han, D Gong, Y Jin, Q Pan
Applied Soft Computing 42, 229-245, 2016
882016
An improved NSGA-II algorithm for multi-objective lot-streaming flow shop scheduling problem
YYHDGXSQ Pan
International Journal of Production Research 52 (8), 2211-2231, 2014
862014
An improved artificial bee colony algorithm for addressing distributed flow shop with distance coefficient in a prefabricated system
J Li, SC Bai, P Duan, H Sang, Y Han, Z Zheng
International Journal of Production Research 57 (22), 6922-6942, 2019
832019
An improved Jaya algorithm for solving the flexible job shop scheduling problem with transportation and setup times
J Li, J Deng, C Li, Y Han, J Tian, B Zhang, C Wang
Knowledge-Based Systems 200, 106032, 2020
792020
Metaheuristics for solving the vehicle routing problem with the time windows and energy consumption in cold chain logistics
M Song, J Li, Y Han, Y Han, L Liu, Q Sun
Applied Soft Computing 95, 106561, 2020
782020
Efficient multi-objective algorithm for the lot-streaming hybrid flowshop with variable sub-lots
J Li, X Tao, B Jia, Y Han, C Liu, P Duan, Z Zheng, H Sang
Swarm and Evolutionary Computation 52, 100600, 2020
782020
A hybrid Pareto-based tabu search for the distributed flexible job shop scheduling problem with E/T criteria
JQ Li, P Duan, J Cao, XP Lin, YY Han
IEEE Access 6, 58883-58897, 2018
702018
An improved iterated greedy algorithm for the energy-efficient blocking hybrid flow shop scheduling problem
HX Qin, YY Han, B Zhang, LL Meng, YP Liu, QK Pan, DW Gong
Swarm and Evolutionary Computation 69, 100992, 2022
682022
Meta-heuristic algorithm for solving vehicle routing problems with time windows and synchronized visit constraints in prefabricated systems
J Li, Y Han, P Duan, Y Han, B Niu, C Li, Z Zheng, Y Liu
Journal of Cleaner Production 250, 119464, 2020
672020
An improved artificial bee colony algorithm for the blocking flowshop scheduling problem
YY Han, QK Pan, JQ Li, H Sang
The International Journal of Advanced Manufacturing Technology 60, 1149-1159, 2012
652012
Solving the blocking flow shop scheduling problem with makespan using a modified fruit fly optimisation algorithm
Y Han, D Gong, J Li, Y Zhang
International Journal of Production Research 54 (22), 6782-6797, 2016
642016
The system can't perform the operation now. Try again later.
Articles 1–20