A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs T Pasupathy, C Rajendran, RK Suresh The International Journal of Advanced Manufacturing Technology 27, 804-815, 2006 | 132 | 2006 |
Pareto archived simulated annealing for job shop scheduling with multiple objectives RK Suresh, KM Mohanasundaram The International Journal of Advanced Manufacturing Technology 29, 184-196, 2006 | 126 | 2006 |
Discrete particle swarm optimization (DPSO) algorithm for permutation flowshop scheduling to minimize makespan K Rameshkumar, RK Suresh, KM Mohanasundaram International Conference on Natural Computation, 572-581, 2005 | 116 | 2005 |
AGV schedule integrated with production in flexible manufacturing systems N Jawahar, P Aravindan, SG Ponnambalam, RK Suresh The international journal of advanced manufacturing technology 14, 428-440, 1998 | 62 | 1998 |
Iterated fast local search algorithm for solving quadratic assignment problems AS Ramkumar, SG Ponnambalam, N Jawahar, RK Suresh Robotics and Computer-Integrated Manufacturing 24 (3), 392-401, 2008 | 47 | 2008 |
A hybrid discrete particle swarm optimization algorithm to solve flow shop scheduling problems S Chandrasekaran, SG Ponnambalam, RK Suresh, N Vijayakumar 2006 IEEE conference on cybernetics and intelligent systems, 1-6, 2006 | 41 | 2006 |
Pareto archived simulated annealing for permutation flow shop scheduling with multiple objectives RK Suresh, KM Mohanasundaram IEEE Conference on Cybernetics and Intelligent Systems, 2004. 2, 712-717, 2004 | 31 | 2004 |
Multi-objective particle swarm optimization algorithm for scheduling in flowshops to minimize makespan, total flowtime and completion time variance S Chandrasekaran, SG Ponnambalam, RK Suresh, N Vijayakumar 2007 IEEE Congress on Evolutionary Computation, 4012-4018, 2007 | 27 | 2007 |
An optimal balancing of multiple assembly line for a batch production unit MM Prasad, K Ganesan, RK Suresh International Journal of Lean Thinking 4 (2), 22-32, 2013 | 22 | 2013 |
Lead time reduction through lean technique in an monoblock (swj1hp) pump industry K Ganesan, MM Prasad, RK Suresh Applied Mechanics and Materials 592, 2671-2676, 2014 | 16 | 2014 |
An application of particle swarm optimization algorithm to permutation flowshop scheduling problems to minimize makespan, total flowtime and completion time variance S Chandrasekaran, SG Ponnambalam, RK Suresh, N Vijayakumar 2006 IEEE International Conference on Automation Science and Engineering …, 2006 | 9 | 2006 |
Pairing of intelligent design concept method and Kano model for product development PS Senthil Kumar, S Balasubramanian, RK Suresh Australian Journal of Mechanical Engineering 10 (2), 91-99, 2012 | 7 | 2012 |
Optimization of lean new product development process using advanced dual stage performance phase method PSS Kumar, S Balasubramanian, RK Suresh International Journal of Recent Trends in Engineering 1 (5), 71, 2009 | 7 | 2009 |
Application of Kano Model for classifying the requirements of engineering students MPS Kumar, S Balasubramanian, RK Suresh, S Arularasu International Journal of Mechanical Engineering and Technology 1 (1), 1-6, 2010 | 3 | 2010 |
Optimum tolerance allocation and process selection using simulated annealing K Ganesan, RK Suresh, PV Mohanram, CH Vishnukumar Proceedings of the 4th Int. Conference on Mechanical Engineering, Theni …, 2009 | 3 | 2009 |
Evolutionary algorithm and Threshold accepting algorithm for scheduling in two-machine flow shop with lot streaming S Marimuthu, SG Ponnambalam, RK Suresh IEEE Conference on Cybernetics and Intelligent Systems, 2004. 2, 833-837, 2004 | 3 | 2004 |
Evaluating an obstacle avoidance strategy to ant colony optimization algorithm for classification in event logs R Chandrasekar, RK Suresh, SG Ponnambalam 2006 International Conference on Advanced Computing and Communications, 628-629, 2006 | 2 | 2006 |
Swarm Intelligence and Intelligent Agents-Discrete Particle Swarm Optimization (DPSO) Algorithm for Permutation Flowshop Scheduling to Minimize Makespan K Rameshkumar, RK Suresh, KM Mohanasundaram Lecture Notes in Computer Science 3612, 572-581, 2005 | | 2005 |