Dr Suresh R K
Dr Suresh R K
Professor of Mechanical Engineering
Verified email at cb.amrita.edu - Homepage
TitleCited byYear
A multi-objective genetic algorithm for scheduling in flow shops to minimize the makespan and total flow time of jobs
T Pasupathy, C Rajendran, RK Suresh
The International Journal of Advanced Manufacturing Technology 27 (7-8), 804-815, 2006
1132006
Pareto archived simulated annealing for job shop scheduling with multiple objectives
RK Suresh, KM Mohanasundaram
The International Journal of Advanced Manufacturing Technology 29 (1-2), 184-196, 2006
1032006
Discrete particle swarm optimization (DPSO) algorithm for permutation flowshop scheduling to minimize makespan
K Rameshkumar, RK Suresh, KM Mohanasundaram
International Conference on Natural Computation, 572-581, 2005
852005
AGV schedule integrated with production in flexible manufacturing systems
N Jawahar, P Aravindan, SG Ponnambalam, RK Suresh
The International Journal of Advanced Manufacturing Technology 14 (6), 428-440, 1998
471998
A hybrid discrete particle swarm optimization algorithm to solve flow shop scheduling problems
S Chandrasekaran, SG Ponnambalam, RK Suresh, N Vijayakumar
2006 IEEE conference on cybernetics and intelligent systems, 1-6, 2006
412006
Iterated fast local search algorithm for solving quadratic assignment problems
AS Ramkumar, SG Ponnambalam, N Jawahar, RK Suresh
Robotics and Computer-Integrated Manufacturing 24 (3), 392-401, 2008
342008
Pareto archived simulated annealing for permutation flow shop scheduling with multiple objectives
RK Suresh, KM Mohanasundaram
IEEE Conference on Cybernetics and Intelligent Systems, 2004. 2, 712-717, 2004
262004
Multi-objective particle swarm optimization algorithm for scheduling in flowshops to minimize makespan, total flowtime and completion time variance
S Chandrasekaran, SG Ponnambalam, RK Suresh, N Vijayakumar
2007 IEEE Congress on Evolutionary Computation, 4012-4018, 2007
192007
An application of particle swarm optimization algorithm to permutation flowshop scheduling problems to minimize makespan, total flowtime and completion time variance
S Chandrasekaran, SG Ponnambalam, RK Suresh, N Vijayakumar
2006 IEEE International Conference on Automation Science and Engineering …, 2006
112006
An optimal balancing of multiple assembly line for a batch production unit
MM Prasad, K Ganesan, RK Suresh
Int. J. Lean Think 4 (2), 22-32, 2013
92013
Pairing of intelligent design concept method and Kano model for product development
PS Senthil Kumar, S Balasubramanian, RK Suresh
Australian Journal of Mechanical Engineering 10 (2), 91-99, 2012
42012
Optimization of lean new product development process using advanced dual stage performance phase method
PSS Kumar, S Balasubramanian, RK Suresh
International Journal of Recent Trends in Engineering 1 (5), 71, 2009
42009
Application of Kano Model for classifying the requirements of engineering students
MPS Kumar, S Balasubramanian, RK Suresh, S Arularasu
International Journal of Mechanical Engineering and Technology 1 (1), 1-6, 2010
32010
Evolutionary algorithm and Threshold accepting algorithm for scheduling in two-machine flow shop with lot streaming
S Marimuthu, SG Ponnambalam, RK Suresh
IEEE Conference on Cybernetics and Intelligent Systems, 2004. 2, 833-837, 2004
32004
Evaluating an obstacle avoidance strategy to ant colony optimization algorithm for classification in event logs
R Chandrasekar, RK Suresh, SG Ponnambalam
2006 International Conference on Advanced Computing and Communications, 628-629, 2006
22006
Lead Time Reduction through Lean Technique in an Monoblock (SWJ1HP) Pump Industry
K Ganesan, MM Prasad, RK Suresh
Applied Mechanics and Materials 592, 2671-2676, 2014
12014
Optimum tolerance allocation and process allocation using simulated annealing
K Ganesan, RK Suresh, PV Mohanram, CH Vishnukumar
4th Conf on MechEng VI, 201-205, 2001
12001
Swarm Intelligence and Intelligent Agents-Discrete Particle Swarm Optimization (DPSO) Algorithm for Permutation Flowshop Scheduling to Minimize Makespan
K Rameshkumar, RK Suresh, KM Mohanasundaram
Lecture Notes in Computer Science 3612, 572-581, 2005
2005
The system can't perform the operation now. Try again later.
Articles 1–18