Obserwuj
David Chua Kim Huat
David Chua Kim Huat
Zweryfikowany adres z nus.edu.sg
Tytuł
Cytowane przez
Cytowane przez
Rok
Critical success factors for different project objectives
DKH Chua, YC Kog, PK Loh
Journal of construction engineering and management 125 (3), 142-150, 1999
11251999
Construction resource scheduling with genetic algorithms
WT Chan, DKH Chua, G Kannan
Journal of construction engineering and management 122 (2), 125-132, 1996
3611996
Key factors in bid reasoning model
DKH Chua, D Li
Journal of Construction Engineering and Management 126 (5), 349-357, 2000
2972000
Case-based reasoning approach in bid decision making
DKH Chua, DZ Li, WT Chan
Journal of construction engineering and management 127 (1), 35-45, 2001
2322001
Incident causation model for improving feedback of safety knowledge
DKH Chua, YM Goh
Journal of construction engineering and management 130 (4), 542-551, 2004
2222004
BIM-based Last Planner System tool for improving construction project management
D Heigermoser, BG de Soto, ELS Abbott, DKH Chua
Automation in Construction 104, 246-254, 2019
2062019
Model for construction budget performance—Neural network approach
DKH Chua, YC Kog, PK Loh, EJ Jaselskis
Journal of Construction Engineering and Management 123 (3), 214-222, 1997
1691997
Moving element method for train‐track dynamics
CG Koh, JSY Ong, DKH Chua, J Feng
International Journal for Numerical Methods in Engineering 56 (11), 1549-1567, 2003
1632003
Neural network analysis of construction safety management systems: A case study in Singapore
YM Goh, D Chua
Construction Management and Economics 31 (5), 460-470, 2013
1442013
Design-for-safety knowledge library for BIM-integrated safety risk reviews
MA Hossain, ELS Abbott, DKH Chua, TQ Nguyen, YM Goh
Automation in Construction 94, 290-302, 2018
1402018
Use of a WBS matrix to improve interface management in projects
DK Chua, M Godinot
Journal of construction engineering and management 132 (1), 67-79, 2006
1382006
Key determinants for construction schedule performance
YC Kog, DKH Chua, PK Loh, EJ Jaselskis
International Journal of project management 17 (6), 351-359, 1999
1331999
Potential applications of UAV along the construction's value chain
QFM Dupont, DKH Chua, A Tashrif, ELS Abbott
Procedia Engineering 182, 165-173, 2017
1242017
Case-based reasoning approach to construction safety hazard identification: Adaptation and utilization
YM Goh, DKH Chua
Journal of Construction Engineering and Management 136 (2), 170-178, 2010
1232010
Case-based reasoning for construction hazard identification: Case representation and retrieval
YM Goh, DKH Chua
Journal of Construction Engineering and Management 135 (11), 1181-1189, 2009
1132009
Interface management for China’s build–operate–transfer projects
WT Chan, C Chen, JI Messner, DK Chua
Journal of Construction Engineering and Management 131 (6), 645-655, 2005
1002005
Steady-state vibration of subway-soil-building system
T Balendra, KH Chua, KW Lo, SL Lee
Journal of engineering mechanics 115 (1), 145-162, 1989
1001989
Impacts of obstacles in East Asian cross-border construction
DKH Chua, Y Wang, WT Tan
Journal of construction engineering and management 129 (2), 131-141, 2003
962003
Integrated prefabrication configuration and component grouping for resource optimization of precast production
A Khalili, DK Chua
Journal of Construction Engineering and Management 140 (2), 04013052, 2014
952014
Groundborne vibrations due to trains in tunnels
KH Chua, T Balendra, KW Lo
Earthquake engineering & structural dynamics 21 (5), 445-460, 1992
951992
Nie można teraz wykonać tej operacji. Spróbuj ponownie później.
Prace 1–20