Bożena Skołud
Bożena Skołud
Zweryfikowany adres z polsl.pl
TytułCytowane przezRok
Strategie i praktyki sprawnego działania: Lean, Six Sigma i inne
A Hamrol, J Gawlik, B Skołud
Wydawnictwo Naukowe PWN, 2015
762015
Organizacja systemów produkcyjnych
J Lewandowski, B Skołud, D Plinta
Polskie Wydawnictwo Ekonomiczne, 2014
392014
Transient states of cyclic production planning and control
D Krenczyk, B Skołud
Applied Mechanics and Materials 657, 961-965, 2014
282014
Robust scheduling, a production scheduling model of failures
I Paprocka, B Skołud
Applied Mechanics and Materials 307, 443-446, 2013
152013
A hybrid multi-objective immune algorithm for predictive and reactive scheduling
I Paprocka, B Skołud
Journal of Scheduling 20 (2), 165-182, 2017
132017
Flow synchronisation of the production systems: The distributed control approach
B Skołud, D Krenczyk
IFAC Proceedings Volumes 34 (2), 129-134, 2001
132001
Algorytmy immunologiczne w szeregowaniu zadań produkcyjnych
B Skołud, I Wosik
Zarządzanie przedsiębiorstwem 11 (1), 47-56, 2008
122008
The requirements and possibilities balance method used for production planning in the manufacturing assembly systems
A Dobrzańska, B Skołud
Journal of materials processing technology 157, 91-101, 2004
122004
Estimation of reliability characteristics in a production scheduling model with time-changing parameters–second part, numerical example
B Skołud, I Wosik, WM Kempa, K Kalinowski
J. Lipski. Lublin, 19-29, 2011
112011
Zarządzanie operacyjne
B Skołud
Gliwice: Wyd. Politechniki Śląskiej, 2006
112006
Estimation of reliability characteristics in a production scheduling model with time-changing parameters–first part, theory
WM Kempa, I Wosik, B Skołud
J. Lipski. Lublin, 7-18, 2011
102011
Computer aided technological and organizational processes planning
K Kalinowski, B Skołud, C Grabowik, D Krenczyk
Proceedings of the Contributions of 15th International Scientific Conference …, 2007
92007
Market oriented approach to the production management on the operational level
B Skołud
Advanced Materials Research 837, 663-668, 2014
82014
Multi-objective genetic and immune algorithms for batch scheduling problem with dependent setups
B Skołud, I Wosik, I Wosik
Recent developments in artificial intelligence methods, 185-196, 2007
82007
Advisory system assisting selection of project structures and project team
M Musztyfaga, B Skołud
Journal of Achievements in Materials and Manufacturing Engineering 20 (1-2 …, 2007
82007
Integration of manufacturing functions for SME
B Skołud, D Krenczyk, K Kalinowski, G Ćwikła, C Grabowik
Holonic based approach Advances in Intelligent Systems and Computing 527 …, 2016
72016
Planning of the multiassortment repetitive production
B Skolud, S Klos, D Gattner
Zeszyty Naukowe Politechniki Slaskiej, 2000
72000
Tuning of a fuzzy system for controlling searching process in multi objective scheduling immune algorithm
I Wosik, B Skołud
Journal of Machine engineering 9 (1), 130--143, 2009
62009
Approaches to the production flow scheduling and control, Intelligent manufacturing for industrial business process.“
B Skołud
Journal of Machine Engineering 8 (2), 5-13, 2008
62008
Advances in Intelligent Systems and Computing 527 ed Janusz Kacprzyk
B Skołud, D Krenczyk, K Kalinowski, G Ćwikła, C Grabowik
Springer) Integration of manufacturing functions for SME. Holonic based approach, 2017
52017
Nie można teraz wykonać tej operacji. Spróbuj ponownie później.
Prace 1–20