Follow
Yugma Galliam Claude
Title
Cited by
Cited by
Year
A memetic algorithm to solve an unrelated parallel machine scheduling problem with auxiliary resources in semiconductor manufacturing
A Bitar, S Dauzère-Pérès, C Yugma, R Roussel
Journal of Scheduling 19 (4), 367-376, 2016
882016
A batching and scheduling algorithm for the diffusion area in semiconductor manufacturing
C Yugma, S Dauzère-Pérès, C Artigues, A Derreumaux, O Sibille
International Journal of Production Research 50 (8), 2118-2132, 2012
782012
Integration of scheduling and advanced process control in semiconductor manufacturing: review and outlook
AO Claude Yugma, Jakey Blue, Stéphane Dauzère-Pérès
Journal of Scheduling 18 (2), 195-205, 2015
772015
A literature review on sampling techniques in semiconductor manufacturing
J Nduhura-Munga, G Rodriguez-Verjan, S Dauzère-Pérès, C Yugma, ...
IEEE Transactions on Semiconductor Manufacturing 26 (2), 188-195, 2013
642013
A batch-oblivious approach for complex job-shop scheduling problems
S Knopp, S Dauzère-Pérès, C Yugma
European Journal of Operational Research 263 (1), 50-61, 2017
612017
A smart sampling algorithm to minimize risk dynamically
S Dauzere-Péres, JL Rouveyrol, C Yugma, P Vialletelle
2010 IEEE/SEMI Advanced Semiconductor Manufacturing Conference (ASMC), 307-310, 2010
542010
Metaheuristics for the job-shop scheduling problem with machine availability constraints
K Tamssaouet, S Dauzère-Pérès, C Yugma
Computers & Industrial Engineering 125, 1-8, 2018
522018
Automatic equipment fault fingerprint extraction for the fault diagnostic on the batch process data
H Rostami, J Blue, C Yugma
Applied Soft Computing 68, 972-989, 2018
402018
Parallel machine scheduling with time constraints on machine qualifications
M Nattaf, S Dauzère-Pérès, C Yugma, CH Wu
Computers & Operations Research 107, 61-76, 2019
372019
Scheduling job families on non-identical parallel machines with time constraints
CY Ali Obeid, Stéphane Dauzère-Pérès
Annals OR 213 (1), 221-234, 2014
37*2014
Scheduling jobs on parallel machines to minimize a regular step total cost function
B Detienne, S Dauzere-Péres, C Yugma
Journal of Scheduling 14, 523-538, 2011
362011
Simulation of a full 300mm semiconductor manufacturing plant with material handling constraints
JE Kiba, G Lamiable, S Dauzère-Pérès, C Yugma
Proceedings of the 2009 Winter Simulation Conference (WSC), 1601-1609, 2009
342009
Multiobjective optimization for complex flexible job-shop scheduling problems
K Tamssaouet, S Dauzère-Pérès, S Knopp, A Bitar, C Yugma
European Journal of Operational Research 296 (1), 87-100, 2022
332022
Unrelated parallel machine scheduling with new criteria: Complexity and models
B Abdoul, DP Stéphane, Y Claude
Computers & Operations Research 132 (https://doi.org/10.1016/j.cor.2021.10529), 2021
322021
Dynamic management of controls in semiconductor manufacturing
JN Munga, S Dauzère-Pérès, P Vialletelle, C Yugma
2011 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, 1-6, 2011
282011
Production control in semiconductor manufacturing with time constraints
R Sadeghi, S Dauzère-Pérès, C Yugma, G Lepelletier
2015 26th Annual SEMI Advanced Semiconductor Manufacturing Conference (ASMC …, 2015
272015
A Batch Optimization Sofware for diffusion area scheduling in semiconductor manufacturing
C Yugma, S Dauzere-Peres, A Derreumaux, O Sibille
2008 IEEE/SEMI Advanced Semiconductor Manufacturing Conference, 327-332, 2008
262008
Equipment condition diagnosis and fault fingerprint extraction in semiconductor manufacturing
H Rostami, J Blue, C Yugma
2016 15th IEEE International Conference on Machine Learning and Applications …, 2016
242016
Model and exact solution for a two-echelon inventory routing problem
K Farias, K Hadj-Hamou, C Yugma
International Journal of Production Research 59 (10), 3109-3132, 2021
222021
A queue-based aggregation approach for performance evaluation of a production system with an AMHS
M Mohammadi, S Dauzère-Pérès, C Yugma, M Karimi-Mamaghan
Computers & Operations Research 115, 104838, 2020
222020
The system can't perform the operation now. Try again later.
Articles 1–20