Sequencing of jobs in some production system
J Grabowski, J Pempera
European journal of operational research 125 (3), 535-550, 2000
2932000
Some local search algorithms for no-wait flow-shop problem with makespan criterion
J Grabowski, J Pempera
Computers & Operations Research 32 (8), 2197-2212, 2005
2372005
The permutation flow shop problem with blocking. A tabu search approach
J Grabowski, J Pempera
Omega 35 (3), 302-311, 2007
1962007
New block properties for the permutation flow shop problem with application in tabu search
J Grabowski, J Pempera
Journal of the Operational Research Society 52, 210-220, 2001
1052001
Parallel tabu search algorithm for the hybrid flow shop problem
W Bożejko, J Pempera, C Smutnicki
Computers & Industrial Engineering 65 (3), 466-474, 2013
762013
Parallel tabu search for the cyclic job shop scheduling problem
W Bożejko, A Gnatowski, J Pempera, M Wodecki
Computers & Industrial Engineering 113, 512-524, 2017
652017
Optimizing bicriteria flow shop scheduling problem by simulated annealing algorithm
P Jarosław, S Czesław, Ż Dominik
Procedia Computer Science 18, 936-945, 2013
372013
Parallel simulated annealing for the job shop scheduling problem
W Bożejko, J Pempera, C Smutnicki
Computational Science–ICCS 2009: 9th International Conference Baton Rouge …, 2009
352009
Open shop cyclic scheduling
J Pempera, C Smutnicki
European Journal of Operational Research 269 (2), 773-781, 2018
342018
A new approach for multi-criteria scheduling
C Smutnicki, J Pempera, J Rudy, D Żelazny
Computers & Industrial Engineering 90, 212-220, 2015
182015
Parallel simulated annealing algorithm for cyclic flexible job shop scheduling problem
W Bożejko, J Pempera, M Wodecki
Artificial Intelligence and Soft Computing: 14th International Conference …, 2015
172015
Scheduling and routing algorithms for rail freight transportation
W Bożejko, R Grymin, J Pempera
Procedia Engineering 178, 206-212, 2017
162017
A fine-grained parallel algorithm for the cyclic flexible job shop problem
W Bożejko, J Pempera, M Wodecki
Archives of Control Sciences 27 (2), 2017
152017
Cyclic hybrid flow-shop scheduling problem with machine setups
W Bożejko, Ł Gniewkowski, J Pempera, M Wodecki
Procedia Computer Science 29, 2127-2136, 2014
122014
Cyclic flow-shop scheduling with no-wait constraints and missing operations
C Smutnicki, J Pempera, G Bocewicz, Z Banaszak
European Journal of Operational Research 302 (1), 39-49, 2022
102022
Scheduling in production of concrete wares
J Grabowski, J Pempera, C Smutnicki
Operations Research Proceedings 1996: Selected Papers of the Symposium on …, 1997
101997
Distributed quantum annealing on d-wave for the single machine total weighted tardiness scheduling problem
W Bożejko, J Pempera, M Uchroński, M Wodecki
International Conference on Computational Science, 171-178, 2022
82022
Designing cyclic schedules for streaming repetitive job-shop manufacturing systems with blocking and no-wait constraints
R Wójcik, J Pempera
IFAC-PapersOnLine 52 (10), 73-78, 2019
72019
On the simulated annealing adaptation for tasks transportation optimization
A Burduk, W Bożejko, J Pempera, K Musiał
Logic Journal of the IGPL 26 (6), 581-592, 2018
72018
Parallel single-thread strategies in scheduling
W Bożejko, J Pempera, A Smutnicki
Artificial Intelligence and Soft Computing–ICAISC 2008: 9th International …, 2008
72008