Follow
Kim LaScola Needy
Title
Cited by
Cited by
Year
The economic benefits of green buildings: a comprehensive case study
R Ries, MM Bilec, NM Gokhan, KLS Needy
The engineering economist 51 (3), 259-295, 2006
3552006
A classification scheme for the process industry to guide the implementation of lean
FA Abdulmalek, J Rajgopal, KLS Needy
Engineering management journal 18 (2), 15-25, 2006
3042006
A procedure for smooth implementation of activity-based costing in small companies
N Roztocki, JD Porter, RM Thomas, KLS Needy
Engineering Management Journal 16 (4), 19-27, 2004
2232004
Human related issues in manufacturing cell design, implementation, and operation: a review and survey
B Bidanda, P Ariyawongrat, KLS Needy, BA Norman, ...
Computers & Industrial Engineering 48 (3), 507-523, 2005
1892005
Worker assignment in cellular manufacturing considering technical and human skills
BA Norman, W Tharmmaphornphilas, KL Needy, B Bidanda, RC Warner
International Journal of Production Research 40 (6), 1479-1492, 2002
1842002
Integrating activity-based costing and economic value added in manufacturing
N Roztocki, KLS Needy
Engineering Management Journal 11 (2), 17-22, 1999
1211999
Development of a simultaneous design for supply chain process for the optimization of the product design and supply chain configuration problem
NM Gokhan, KLS Needy, BA Norman
Engineering Management Journal 22 (4), 20-30, 2010
952010
Methods for handling uncertainty in activity based costing systems
H Nachtmann, KLS Needy
The Engineering Economist 48 (3), 259-282, 2003
872003
An examination of the economic benefits of ISO 9000 and the Baldrige Award to manufacturing firms
JP Wilson, MAT Walsh, KLS Needy
Engineering Management Journal 15 (4), 3-10, 2003
832003
Implementing activity-based costing systems in small manufacturing firms: A field study
KLS Needy, H Nachtmann, N Roztocki, RC Warner, B Bidanda
Engineering Management Journal 15 (1), 3-10, 2003
832003
Fuzzy activity based costing: a methodology for handling uncertainty in activity based costing systems
H Nachtmann, KLS Needy
The engineering economist 46 (4), 245-273, 2001
792001
EVA for small manufacturing companies
N Roztocki, KL Needy
Proceedings from the 1999 SAM International Management Conference, 461-469, 1999
721999
Modeling risk in a design for supply chain problem
E Claypool, BA Norman, KLS Needy
Computers & Industrial Engineering 78, 44-54, 2014
572014
An integrated activity-based costing and economic value added system as an engineering management tool for manufacturers
N Roztocki, KL Needy
Proceedings from the 1998 ASEM National Conference 77, 84, 1998
541998
Assessing human capital: a lean manufacturing example
KLS Needy, BA Norman, B Bidanda, P Ariyawongrat, ...
Engineering Management Journal 14 (3), 35-39, 2002
502002
Supplier quality management inside and outside the construction industry
RY AlMaian, KLS Needy, KD Walsh, TCL Alves
Engineering Management Journal 27 (1), 11-22, 2015
472015
Building design and performance: A comparative longitudinal assessment of a Children's hospital
CL Thiel, KLS Needy, R Ries, D Hupp, MM Bilec
Building and Environment 78, 130-136, 2014
472014
A cost model for the evaluation of alternative cellular manufacturing configurations
KLS Needy, RE Billo, RC Warner
Computers & industrial engineering 34 (1), 119-134, 1998
461998
How to design and implement an integrated activity-based costing and economic value added system
N Roztocki, KL Needy
Proceedings from the Industrial Engineering research'99 Conference, 1999
431999
Group decision making with dispersion in the analytic hierarchy process
NM Scala, J Rajgopal, LG Vargas, KLS Needy
Group Decision and Negotiation 25, 355-372, 2016
412016
The system can't perform the operation now. Try again later.
Articles 1–20