Suleyman Mete
Title
Cited by
Cited by
Year
A solution approach based on beam search algorithm for disassembly line balancing problem
S Mete, ZA Cil, K Ağpak, E Özceylan, A Dolgui
Journal of Manufacturing Systems 41, 188-200, 2016
362016
Risk assessment for clearing and grading process of a natural gas pipeline project: An extended TOPSIS model with Pythagorean fuzzy sets for prioritizing hazards
NE Oz, S Mete, F Serin, M Gul
Human and Ecological Risk Assessment: An International Journal 25 (6), 1615-1632, 2019
222019
Assessing occupational risks in pipeline construction using FMEA-based AHP-MOORA integrated approach under Pythagorean fuzzy environment
S Mete
Human and Ecological Risk Assessment: An International Journal, 1-16, 2019
222019
Analysis of the type II robotic mixed-model assembly line balancing problem
ZA Çil, S Mete, K Ağpak
Engineering Optimization 49 (6), 990-1009, 2017
212017
A beam search approach for solving type II robotic parallel assembly line balancing problem
ZA Çil, S Mete, E Özceylan, K Ağpak
Applied Soft Computing 61, 129-138, 2017
202017
Resource constrained disassembly line balancing problem
S Mete, ZA Çil, E Özceylan, K Ağpak
IFAC-PapersOnLine 49 (12), 921-925, 2016
172016
An integrated best-worst and interval type-2 fuzzy TOPSIS methodology for green supplier selection
M Yucesan, S Mete, F Serin, E Celik, M Gul
Mathematics 7 (2), 182, 2019
162019
An optimisation support for the design of hybrid production lines including assembly and disassembly tasks
S Mete, ZA Çil, E Özceylan, K Ağpak, O Battaïa
International Journal of Production Research 56 (24), 7375-7389, 2018
152018
A goal programming approach for robotic assembly line balancing problem
ZA Çil, S Mete, K Ağpak
IFAC-PapersOnLine 49 (12), 938-942, 2016
142016
Location and coverage analysis of bike-sharing stations in university campus
S Mete, ZA Cil, E Özceylan
Business Systems Research Journal 9 (2), 80-95, 2018
92018
A fast branch, bound and remember algorithm for disassembly line balancing problem
Z Li, ZA Çil, S Mete, I Kucukkoc
International Journal of Production Research, 1-15, 2019
62019
Supply-driven rebalancing of disassembly lines: A novel mathematical model approach
S Mete, ZA Çil, E Celik, E Ozceylan
Journal of cleaner production 213, 1157-1164, 2019
62019
Multi objective generalized resource constrained two sided assembly line balancing problem and computational analaysis
S Mete, K Agpak
JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY 28 …, 2013
52013
A decision-support system based on Pythagorean fuzzy VIKOR for occupational risk assessment of a natural gas pipeline construction
S Mete, F Serin, NE Oz, M Gul
Journal of Natural Gas Science and Engineering 71, 102979, 2019
42019
Stochastic multi-criteria decision-making: an overview to methods and applications
E Celik, M Gul, M Yucesan, S Mete
Beni-Suef University Journal of Basic and Applied Sciences 8 (1), 4, 2019
32019
An efficient algorithm for U-type assembly line re-balancing problem with stochastic task times
F Serin, S Mete, E Çelik
Assembly Automation, 2019
32019
A forecasting model for patient arrivals of an emergency department in healthcare management systems
M Yucesan, M Gul, S Mete, E Celik
Intelligent Systems for Healthcare Management and Delivery, 266-284, 2019
32019
Assembly Line Balancing Problem with Stochastic Sequence-Dependent Setup Times
Z Diri, S Mete, Z Çil, K Ağpak
Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi 21 (4), 152-157, 2015
3*2015
A heuristic approach for joint design of assembly and disassembly line balancing problem
S Mete, ZA Çıl, E Özceylan
2017 8th International Conference on Information Technology (ICIT), 418-423, 2017
12017
A heuristic algorithm for assembly line balancing with stochastic sequence-dependent setup times
ZA Çıl, S Mete, E Özceylan, ZD Kenger, H Çil
2017 8th International Conference on Information Technology (ICIT), 424-428, 2017
12017
The system can't perform the operation now. Try again later.
Articles 1–20