Follow
Byung Jun Joo
Byung Jun Joo
Singapore Institute of Manufacturing Technology
Verified email at simtech.a-star.edu.sg
Title
Cited by
Cited by
Year
Scheduling wafer lots on diffusion machines in a semiconductor wafer fabrication facility
YD Kim, BJ Joo, SY Choi
IEEE Transactions on Semiconductor Manufacturing 23 (2), 246-254, 2010
462010
A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints
BJ Joo, YD Kim
Journal of the Operational Research Society 60, 572-582, 2009
372009
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint
YD Kim, BJ Joo, JH Shin
Journal of Heuristics 15, 19-42, 2009
322009
Multi-level job scheduling under processing time uncertainty
BJ Joo, SO Shim, TJ Chua, TX Cai
Computers & Industrial Engineering 120, 480-487, 2018
212018
Dispatching rule-based algorithms for a dynamic flexible flow shop scheduling problem with time-dependent process defect rate and quality feedback
BJ Joo, YC Choi, P Xirouchakis
Procedia CIRP 7, 163-168, 2013
192013
Multimode resource-constrained multi-project scheduling with ad hoc activity splitting
BJ Joo, PC Chua
2017 IEEE International conference on industrial engineering and engineering …, 2017
92017
Coordination-based reactive resource-constrained project scheduling
BJ Joo, TJ Chua, TX Cai, PC Chua
Procedia CIRP 81, 51-56, 2019
62019
A scheduling algorithm for workstations with limited waiting time constraints in a semiconductor wafer fabrication facility
BJ Joo, YD Kim, JY Bang
대한산업공학회지 35 (4), 266-279, 2009
52009
A production scheduling problem with uncertain sequence-dependent set-up times and random yield
BJ Joo, P Xirouchakis
International Journal of Production Research 53 (9), 2820-2835, 2015
42015
An optimal solution algorithm for a batch-processing machine scheduling problem with a product-mix ratio constraint
BJ Joo, YD Kim
INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND …, 2007
12007
Scheduling wafer lots on diffusion machines in a semiconductor wafer fabrication facility
SY Choi, BJ Joo, YD Kim
International Conference on Modeling and Analysis of Semiconductor …, 2005
12005
국방분야 전력지원체계에서의 생산스케줄링 문제에 관한 연구
주병준, 안남수, 박상원, 채종목, 오병인
한국경영과학회 학술대회논문집, 559-574, 2013
2013
Heuristics for scheduling jobs with distinct ready times on a two-stage hybrid flowhop scheduling problem with a product-mix ratio constraint
BJ Joo, JH Shin, YD Kim
Asia-Pacific Management Conference, 965-978, 2004
2004
HEURISTICS FOR A TWO-STAGE HYBRID FLOWSHOP SCHEDULINGPROBLEM WITH INCOMPATIBLE JOB FAMILIES
BJ Joo, YD Kim
Asia Pacific Industrial Engineering and Management Systems Conference, 31.15 …, 2004
2004
Scheduling two-machine flowshop with limited waiting time to minimize makespan
BJ Joo, YD Kim
International Conference on Computers and Industrial Engineering, CIE561-CIE561, 2004
2004
조정 메쉬의 각진 모서리를 유지하기 위한 수정 Doo-Sabin 곡면 분할 알고리듬 개발
이현찬, 주병준, 홍충성
한국 CDE 학회, 2003
2003
The system can't perform the operation now. Try again later.
Articles 1–16