Obserwuj
Jin
Jin
Nieznane powiązanie
Zweryfikowany adres z umich.edu
Tytuł
Cytowane przez
Cytowane przez
Rok
VLSI physical design: from graph partitioning to timing closure
AB Kahng, J Lienig, IL Markov, J Hu
Springer Science & Business Media, 2011
3662011
Vicis: A reliable network for unreliable silicon
D Fick, A DeOrio, J Hu, V Bertacco, D Blaauw, D Sylvester
Proceedings of the 46th Annual Design Automation Conference, 812-817, 2009
2362009
Progress and challenges in VLSI placement research
IL Markov, J Hu, MC Kim
Proceedings of the IEEE 103 (11), 1985-2003, 2015
1322015
A reliable routing architecture and algorithm for NoCs
A DeOrio, D Fick, V Bertacco, D Sylvester, D Blaauw, J Hu, G Chen
IEEE Transactions on Computer-Aided Design of Integrated Circuits and …, 2012
1212012
A SimPLR method for routability-driven placement
MC Kim, J Hu, DJ Lee, IL Markov
2011 IEEE/ACM International Conference on Computer-Aided Design (ICCAD), 67-73, 2011
1072011
Completing high-quality global routes
J Hu, JA Roy, IL Markov
Proceedings of the 19th international symposium on Physical design, 35-41, 2010
822010
ICCAD-2015 CAD contest in incremental timing-driven placement and benchmark suite
MC Kim, J Hu, J Li, N Viswanathan
2015 IEEE/ACM International Conference on Computer-Aided Design (ICCAD), 921-926, 2015
702015
Sensitivity-guided metaheuristics for accurate discrete gate sizing
J Hu, AB Kahng, SH Kang, MC Kim, IL Markov
Proceedings of the International Conference on Computer-Aided Design, 233-239, 2012
692012
Sidewinder: a scalable ILP-based router
J Hu, JA Roy, IL Markov
Proceedings of the 2008 international workshop on System level interconnect …, 2008
312008
TAU 2014 contest on removing common path pessimism during timing analysis
J Hu, D Sinha, I Keller
Proceedings of the 2014 on International Symposium on physical design, 153-160, 2014
242014
TAU 2014 contest on removing common path pessimism during timing analysis
J Hu, D Sinha, I Keller
Proceedings of the 2014 on International Symposium on physical design, 153-160, 2014
242014
TAU 2015 contest on incremental timing analysis
J Hu, G Schaeffer, V Garg
2015 IEEE/ACM International Conference on Computer-Aided Design (ICCAD), 882-889, 2015
232015
Taming the complexity of coordinated place and route
J Hu, MC Kim, IL Markov
2013 50th ACM/EDAC/IEEE Design Automation Conference (DAC), 1-7, 2013
212013
Global and detailed placement
AB Kahng, J Lienig, IL Markov, J Hu
VLSI Physical Design: from graph partitioning to timing closure, 95-130, 2022
62022
Timing closure
AB Kahng, J Lienig, IL Markov, J Hu
VLSI Physical Design: From Graph Partitioning to Timing Closure, 219-264, 2011
42011
Statistical timing using macro-model considering statistical timing value entry
J Hu, SSK Raghunathan, D Sinha, VP Zolotov
US Patent 9,798,843, 2017
32017
High-performance Global Routing for Trillion-gate Systems-on-Chips.
J Hu
32013
TAU 2014 contest on removing common path pessimism during timing analysis: Special session paper: Common path pessimism removal (CPPR)
J Hu, D Sinha, I Keller
2014 IEEE/ACM International Conference on Computer-Aided Design (ICCAD), 591-591, 2014
22014
Netlist and system partitioning
AB Kahng, J Lienig, IL Markov, J Hu
VLSI Physical Design: From Graph Partitioning to Timing Closure, 31-54, 2011
22011
Routing
GE Téllez, J Hu, Y Wei
Electronic Design Automation for IC Implementation, Circuit Design, and …, 2017
12017
Nie można teraz wykonać tej operacji. Spróbuj ponownie później.
Prace 1–20