Damian Krenczyk
Damian Krenczyk
Zweryfikowany adres z polsl.pl
Tytuł
Cytowane przez
Cytowane przez
Rok
Integration production planning and scheduling systems for determination of transitional phases in repetitive production
D Krenczyk, K Kalinowski, C Grabowik
International Conference on Hybrid Artificial Intelligence Systems, 274-283, 2012
392012
Production preparation and order verification systems integration using method based on data transformation and data mapping
D Krenczyk, B Skolud
International Conference on Hybrid Artificial Intelligence Systems, 397-404, 2011
342011
The hybrid method of knowledge representation in a CAPP knowledge based system
C Grabowik, D Krenczyk, K Kalinowski
International Conference on Hybrid Artificial Intelligence Systems, 284-295, 2012
322012
Transient states of cyclic production planning and control
D Krenczyk, B Skołud
Applied Mechanics and Materials 657, 961-965, 2014
282014
Predictive-reactive strategy for real time scheduling of manufacturing systems
K Kalinowski, D Krenczyk, C Grabowik
Applied Mechanics and Materials 307, 470-473, 2013
282013
The deadlock protection method used in the production systems
D Krenczyk, A Dobrzańska-Danikiewicz
Journal of Materials Processing Technology 164, 1388-1394, 2005
272005
ERP, APS and simulation systems integration to support production planning and scheduling
D Krenczyk, M Jagodzinski
10th International Conference on Soft Computing Models in Industrial and …, 2015
202015
Production planning and control using advanced simulation systems
D Krenczyk, M Olender
Int. J. of Modern Manufacturing Technologies 6, 38-43, 2014
202014
Integration of manufacturing functions for SME. Holonic-based approach
B Skolud, D Krenczyk, K Kalinowski, G Ćwikła, C Grabowik
International Joint Conference SOCO’16-CISIS’16-ICEUTE’16, 464-473, 2016
162016
Application of the MIAS methodology in design of the data acquisition system for wastewater treatment plant
G Ćwikła, D Krenczyk, A Kampa, G Gołda
IOP Conference Series: Materials Science and Engineering 95 (1), 012153, 2015
152015
Flow synchronisation of the production systems: The distributed control approach
B Skołud, D Krenczyk
IFAC Proceedings Volumes 34 (2), 129-134, 2001
142001
Performance evaluation of discrete event systems with gpensim
R Davidrajuh, B Skolud, D Krenczyk
Computers 7 (1), 8, 2018
132018
A heuristic and simulation hybrid approach for mixed and multi model assembly line balancing
D Krenczyk, B Skolud, A Herok
International conference on intelligent systems in production engineering …, 2017
132017
Solving repetitive production planning problems. An approach based on activity-oriented Petri nets
B Skolud, D Krenczyk, R Davidrajuh
International Joint Conference SOCO’16-CISIS’16-ICEUTE’16, 397-407, 2016
132016
Multi-assortment rhythmic production planning and control
B Skolud, D Krenczyk, M Zemczak
IOP Conference Series: Materials Science and Engineering 95 (1), 012133, 2015
132015
The method of the production flow synchronisation using the meta-rule conception
A Dobrzańska-Danikiewicz, D Krenczyk
Journal of Materials Processing Technology 164, 1301-1308, 2005
122005
Automatic generation method of simulation model for production planning and simulation systems integration
D Krenczyk
Advanced Materials Research 1036, 825-829, 2014
112014
Study on transient queueing delay in a single-channel queueing model with setup and closedown times
WM Kempa, I Paprocka, K Kalinowski, C Grabowik, D Krenczyk
International Conference on Information and Software Technologies, 464-475, 2016
92016
Semi-automatic simulation model generation of virtual dynamic networks for production flow planning
D Krenczyk, B Skolud, M Olender
IOP Conference Series: Materials Science and Engineering 145 (4), 042021, 2016
92016
Integration of scheduling and discrete event simulation systems to improve production flow planning
D Krenczyk, I Paprocka, WM Kempa, C Grabowik, K Kalinowski
IOP Conference Series: Materials Science and Engineering 145 (2), 022018, 2016
92016
Nie można teraz wykonać tej operacji. Spróbuj ponownie później.
Prace 1–20