Gursel Suer
Gursel Suer
Professor of Industrial and Systems Engineering, Ohio University
Verified email at ohio.edu
TitleCited byYear
Optimal operator assignment and cell loading in labor-intensive manufacturing cells
GA SŁer
Computers & industrial engineering 31 (1-2), 155-158, 1996
871996
Designing parallel assembly lines
GA SŁer
Computers & industrial engineering 35 (3-4), 467-470, 1998
641998
Optimal operator assignment and cell loading when lot-splitting is allowed
GA SŁer, IS Bera
Computers & Industrial Engineering 35 (3-4), 431-434, 1998
621998
Effects of Different Fuzzy Operators on Fuzzy Bi-objective Cell Loading Problem in Labor Intensive Manufacturing Cells
GA Suer, F Arikan, C Babayigit
Proceedings of the 35th International Conference on Computers and Industrial†…, 2005
61*2005
Design of dedicated, shared and remainder cells in a probabilistic demand environment
GA SŁer, J Huang, S Maddisetty
International journal of production research 48 (19), 5613-5646, 2010
592010
Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells
GA SŁer, RR Tummaluri
International Journal of Production Research 46 (2), 469-493, 2008
592008
Intra-cell manpower transfers and cell loading in labor-intensive manufacturing cells
GA SŁer, C Dagli
Computers & Industrial Engineering 48 (3), 643-655, 2005
582005
Evaluation of manufacturing cell loading rules for independent cells
GA Suer, M Saiz, W Gonzalez
International Journal of Production Research 37 (15), 3445-3468, 1999
581999
Stochastic cellular manufacturing system design subject to maximum acceptable risk level
G Egilmez, GRA SŁEr, J Huang
Computers & Industrial Engineering 63 (4), 842-854, 2012
552012
Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method
D Castro-Lacouture, GA SŁer, J Gonzalez-Joaqui, JK Yates
Journal of Construction Engineering and Management 135 (10), 1096-1104, 2009
502009
Stochastic skill-based manpower allocation in a cellular manufacturing system
G Egilmez, B Erenay, GA SŁer
Journal of Manufacturing Systems 33 (4), 578-588, 2014
482014
Manufacturing cell loading rules and algorithms for connected cells
GA SŁer, M Saiz, C Dagli, W Gonzalez
Manufacturing Research and Technology 24, 97-127, 1995
461995
Minimizing the number of tardy jobs in identical machine scheduling
GA SŁer, E BŠez, Z Czajkiewicz
Computers & Industrial Engineering 25 (1-4), 243-246, 1993
451993
Models for cell loading and product sequencing in labor-intensive cells
GA SŁer, J Cosner, A Patten
Computers & Industrial Engineering 56 (1), 97-105, 2009
412009
Heuristic procedures and mathematical models for cell loading and scheduling in a shoe manufacturing company
GA SŁer, A Subramanian, J Huang
Computers & Industrial Engineering 56 (2), 462-475, 2009
382009
Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour intensive manufacturing cells
GA SŁer, F Arikan, C Babayiğit
International Journal of Production Research 46 (2), 371-404, 2008
342008
Identical machine scheduling to minimize the number of tardy jobs when lot-splitting is allowed
GA SŁer, F Pico, A Santiago
Computers & industrial engineering 33 (1-2), 277-280, 1997
341997
A hybrid approach of genetic algorithms and local optimizers in cell loading
GA SŁer, R Vazquez, M Cortes
Computers & Industrial Engineering 48 (3), 625-641, 2005
332005
A dispatching rule-based genetic algorithm for multi-objective job shop scheduling using fuzzy satisfaction levels
J Huang, GA SŁer
Computers & Industrial Engineering 86, 29-42, 2015
312015
Genetic algorithms in lot sizing decisions
W Hernandez, GA Suer
Proceedings of the 1999 Congress on Evolutionary Computation-CEC99 (Cat. No†…, 1999
271999
The system can't perform the operation now. Try again later.
Articles 1–20