Follow
Zhigang Li (李志刚)
Title
Cited by
Cited by
Year
Combined heat and power dispatch considering pipeline energy storage of district heating network
Z Li, W Wu, M Shahidehpour, J Wang, B Zhang
IEEE Transactions on Sustainable Energy 7 (1), 12-22, 2015
6252015
Transmission-constrained unit commitment considering combined electricity and district heating networks
Z Li, W Wu, J Wang, B Zhang, T Zheng
IEEE Transactions on Sustainable Energy 7 (2), 480-492, 2015
3412015
Dynamic Price Vector Formation Model-Based Automatic Demand Response Strategy for PV-Assisted EV Charging Stations
Q Chen, F Wang, BM Hodge, J Zhang, Z Li, M Shafie-Khah, JPS Catalão
IEEE Transactions on Smart Grid 8 (6), 2903-2915, 2017
2082017
Adjustable robust real-time power dispatch with large-scale wind power integration
Z Li, W Wu, B Zhang, B Wang
IEEE Transactions on Sustainable Energy 6 (2), 357-368, 2015
1902015
Decentralized multiarea robust generation unit and tie-line scheduling under wind power uncertainty
Z Li, M Shahidehpour, W Wu, B Zeng, B Zhang, W Zheng
IEEE Transactions on Sustainable Energy 6 (4), 1377-1388, 2015
1322015
Decentralized multi-area dynamic economic dispatch using modified generalized benders decomposition
Z Li, W Wu, B Zhang, B Wang
IEEE Transactions on Power Systems 31 (1), 526-538, 2015
1312015
Decentralized reactive power optimization method for transmission and distribution networks accommodating large-scale DG integration
C Lin, W Wu, B Zhang, B Wang, W Zheng, Z Li
IEEE Transactions on Sustainable Energy 8 (1), 363-373, 2016
1122016
Dynamic economic dispatch using Lagrangian relaxation with multiplier updates based on a quasi-Newton method
Z Li, W Wu, B Zhang, H Sun, Q Guo
IEEE Transactions on Power Systems 28 (4), 4516-4527, 2013
1122013
Approximate linear power flow using logarithmic transform of voltage magnitudes with reactive power and transmission loss consideration
Z Li, J Yu, QH Wu
IEEE Transactions on Power Systems 33 (4), 4593-4603, 2018
972018
Reducing generation uncertainty by integrating CSP with wind power: An adaptive robust optimization-based analysis
R Chen, H Sun, Q Guo, Z Li, T Deng, W Wu, B Zhang
IEEE Transactions on Sustainable Energy 6 (2), 583-594, 2015
962015
Adaptive robust tie-line scheduling considering wind power uncertainty for interconnected power systems
Z Li, W Wu, M Shahidehpour, B Zhang
IEEE transactions on power systems 31 (4), 2701-2713, 2015
912015
Coordinated dispatch of electric power and district heating networks: A decentralized solution using optimality condition decomposition
J Huang, Z Li, QH Wu
Applied Energy 206, 1508-1522, 2017
842017
Fully distributed multi-area economic dispatch method for active distribution networks
W Zheng, W Wu, B Zhang, Z Li, Y Liu
IET Generation, Transmission & Distribution, 2015
792015
Decentralized contingency-constrained tie-line scheduling for multi-area power grids
Z Li, W Wu, B Zeng, M Shahidehpour, B Zhang
IEEE Transactions on Power Systems 32 (1), 354-367, 2017
582017
A dynamic equivalent model for district heating networks: formulation, existence and application in distributed electricity-heat operation
W Zheng, Y Hou, Z Li
IEEE Transactions on Smart Grid 12 (3), 2685-2695, 2021
552021
Robust Scheduling of Integrated Electricity and Heating System Hedging Heating Network Uncertainties
H Zhou, Z Li, JH Zheng, QH Wu, H Zhang
IEEE Transactions on Smart Grid 11 (2), 1543-1555, 2019
492019
Decentralized state estimation of combined heat and power systems using the asynchronous alternating direction method of multipliers
T Zhang, Z Li, QH Wu, X Zhou
Applied Energy 248, 600-613, 2019
432019
Robust look-ahead power dispatch with adjustable conservativeness accommodating significant wind power integration
Z Li, W Wu, B Zhang, B Wang
IEEE Transactions on Sustainable Energy 6 (3), 781-790, 2015
412015
Data-driven real-time power dispatch for maximizing variable renewable generation
Z Li, F Qiu, J Wang
Applied Energy 170, 304-313, 2016
392016
基于混合整数二阶锥规划的主动配电网有功-无功协调多时段优化运行
刘一兵, 吴文传, 张伯明, 李正烁, 李志刚
中国电机工程学报 34 (16), 2575-2583, 2014
372014
The system can't perform the operation now. Try again later.
Articles 1–20