Follow
Fajun Yang
Title
Cited by
Cited by
Year
Flexible job-shop rescheduling for new job insertion by using discrete Jaya algorithm
K Gao, F Yang, MC Zhou, Q Pan, PN Suganthan
IEEE transactions on cybernetics 49 (5), 1944-1955, 2018
2272018
Scheduling of single-arm cluster tools for an atomic layer deposition process with residency time constraints
FJ Yang, NQ Wu, Y Qiao, MC Zhou, ZW Li
IEEE Transactions on Systems, Man, and Cybernetics: Systems 47 (3), 502-516, 2016
1282016
Polynomial approach to optimal one-wafer cyclic scheduling of treelike hybrid multi-cluster tools via Petri nets
F Yang, N Wu, Y Qiao, R Su
IEEE/CAA Journal of Automatica Sinica 5 (1), 270-280, 2017
952017
Wafer sojourn time fluctuation analysis of time-constrained dual-arm cluster tools with wafer revisiting and activity time variation
Y Qiao, NQ Wu, FJ Yang, MC Zhou, QH Zhu
IEEE Transactions on Systems, Man, and Cybernetics: Systems 48 (4), 622-636, 2016
732016
Solving Traffic Signal Scheduling Problems in Heterogeneous Traffic Network by Using Meta-Heuristics
K Gao, Y Zhang, R Su, F Yang, PN Suganthan, MC Zhou
IEEE Transactions on Intelligent Transportation Systems, 2018
552018
Petri net-based optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in wafer fabrication
FJ Yang, NQ Wu, Y Qiao, MC Zhou
IEEE Transactions on Semiconductor Manufacturing 27 (2), 192-203, 2014
532014
Petri net-based polynomially complex approach to optimal one-wafer cyclic scheduling of hybrid multi-cluster tools in semiconductor manufacturing
FJ Yang, NQ Wu, Y Qiao, MC Zhou
IEEE Transactions on Systems, Man, and Cybernetics: Systems 44 (12), 1598-1610, 2014
492014
Decomposition methods for manufacturing system scheduling: A survey
F Yang, K Gao, IW Simon, Y Zhu, R Su
IEEE/CAA Journal of Automatica Sinica 5 (2), 389-400, 2018
372018
Robust scheduling of time-constrained dual-arm cluster tools with wafer revisiting and activity time disturbance
Y Qiao, NQ Wu, FJ Yang, MC Zhou, QH Zhu, T Qu
IEEE Transactions on Systems, Man, and Cybernetics: Systems 49 (6), 1228-1240, 2017
352017
Optimal one-wafer cyclic scheduling of single-arm multicluster tools with two-space buffering modules
FJ Yang, NQ Wu, Y Qiao, MC Zhou
IEEE Transactions on Systems, Man, and Cybernetics: Systems 44 (12), 1584-1597, 2014
302014
Modeling and optimal cyclic scheduling of time-constrained single-robot-arm cluster tools via Petri nets and linear programming
FJ Yang, NQ Wu, Y Qiao, MC Zhou, R Su, T Qu
IEEE Transactions on Systems, Man, and Cybernetics: Systems 50 (3), 871-883, 2017
222017
Optimal one-wafer cyclic scheduling of time-constrained hybrid multicluster tools via Petri nets
FJ Yang, NQ Wu, Y Qiao, MC Zhou
IEEE Transactions on Systems, Man, and Cybernetics: Systems 47 (11), 2920-2932, 2016
222016
Efficient approach to cyclic scheduling of single-arm cluster tools with chamber cleaning operations and wafer residency time constraint
F Yang, N Wu, K Gao, C Zhang, Y Zhu, R Su, Y Qiao
IEEE Transactions on Semiconductor Manufacturing 31 (2), 196-205, 2018
192018
Improved jaya algorithm for flexible job shop rescheduling problem
K Gao, F Yang, J Li, H Sang, J Luo
IEEE Access 8, 86915-86922, 2020
182020
Efficient approach to scheduling of transient processes for time-constrained single-arm cluster tools with parallel chambers
FJ Yang, Y Qiao, KZ Gao, NQ Wu, YT Zhu, IW Simon, R Su
IEEE Transactions on Systems, Man, and Cybernetics: Systems 50 (10), 3646-3657, 2018
182018
Optimal one-wafer cyclic scheduling of hybrid multirobot cluster tools with tree topology
FJ Yang, NQ Wu, Y Qiao, MC Zhou
IEEE Transactions on Systems, Man, and Cybernetics: Systems 48 (2), 289-298, 2016
182016
Wafer residency time analysis for time-constrained single-robot-arm cluster tools with activity time variation
F Yang, X Tang, N Wu, C Zhang, L Gao
IEEE Transactions on Control Systems Technology 28 (4), 1177-1188, 2019
132019
Efficient scheduling approaches to time-constrained single-armed cluster tools with condition-based chamber cleaning operations
C Li, F Yang, L Zhen
International Journal of production research 60 (11), 3555-3568, 2022
102022
Petri net-based efficient determination of optimal schedules for transport-dominant single-arm multi-cluster tools
F Yang, N Wu, Y Qiao, M Zhou, R Su, T Qu
IEEE Access 6, 355-365, 2017
82017
System and method for determining an optimized schedule of a production line
N Wu, F Yang, Y Qiao, MC Zhou
US Patent 10,101,721, 2018
62018
The system can't perform the operation now. Try again later.
Articles 1–20