Follow
Mukund Janardhanan
Mukund Janardhanan
Lecturer in Engineering Management, University of Leicester
Verified email at leicester.ac.uk
Title
Cited by
Cited by
Year
An investigation on minimizing cycle time and total energy consumption in robotic assembly line systems
JM Nilakantan, GQ Huang, SG Ponnambalam
Journal of Cleaner Production 90, 311-325, 2015
1122015
Comprehensive review and evaluation of heuristics and meta-heuristics for two-sided assembly line balancing problem
Z Li, I Kucukkoc, JM Nilakantan
Computers & Operations Research 84, 146-161, 2017
832017
Robotic U-shaped assembly line balancing using particle swarm optimization
J Mukund Nilakantan, SG Ponnambalam
Engineering Optimization 48 (2), 231-252, 2016
752016
Task scheduling system for UAV operations in indoor environment
Y Khosiawan, Y Park, I Moon, JM Nilakantan, I Nielsen
Neural Computing and Applications 31 (9), 5431-5459, 2019
572019
Multi-objective co-operative co-evolutionary algorithm for minimizing carbon footprint and maximizing line efficiency in robotic assembly line systems
JM Nilakantan, Z Li, Q Tang, P Nielsen
Journal of Cleaner Production 156, 124-136, 2017
572017
An effective hybrid cuckoo search and genetic algorithm for constrained engineering design optimization
G Kanagaraj, SG Ponnambalam, N Jawahar, JM Nilakantan
Engineering Optimization 46 (10), 1331-1351, 2014
562014
Bio-inspired search algorithms to solve robotic assembly line balancing problems
J Mukund Nilakantan, SG Ponnambalam, N Jawahar, G Kanagaraj
Neural Computing and Applications 26 (6), 1379-1393, 2015
542015
Metaheuristic algorithms for balancing robotic assembly lines with sequence-dependent robot setup times
MN Janardhanan, Z Li, G Bocewicz, Z Banaszak, P Nielsen
Applied Mathematical Modelling 65, 256-270, 2019
532019
Co-evolutionary particle swarm optimization algorithm for two-sided robotic assembly line balancing problem
Z Li, MN Janardhanan, Q Tang, P Nielsen
Advances in Mechanical Engineering 8 (9), 1687814016667907, 2016
512016
Mathematical model and metaheuristics for simultaneous balancing and sequencing of a robotic mixed-model assembly line
Z Li, MN Janardhanan, Q Tang, P Nielsen
Engineering Optimization 50 (5), 877-893, 2018
372018
Differential evolution algorithm for solving RALB problem using cost-and time-based models
JM Nilakantan, I Nielsen, SG Ponnambalam, S Venkataramanaiah
The International Journal of Advanced Manufacturing Technology 89 (1), 311-332, 2017
372017
Design of energy efficient RAL system using evolutionary algorithms
MJ Nilakantan, SG Ponnambalam, N Jawahar
Engineering Computations 33 (2), 2016
352016
Model and metaheuristics for robotic two-sided assembly line balancing problems with setup times
Z Li, MN Janardhanan, Q Tang, SG Ponnambalam
Swarm and Evolutionary Computation 50, 100567, 2019
242019
A predictive maintenance cost model for CNC SMEs in the era of industry 4.0
K Adu-Amankwa, AKA Attia, MN Janardhanan, I Patel
The International Journal of Advanced Manufacturing Technology 104 (9), 3567 …, 2019
242019
An efficient PSO for type II robotic assembly line balancing problem
JM Nilakantan, SG Ponnambalam
2012 IEEE international conference on automation science and engineering …, 2012
232012
An integrated approach for line balancing and AGV scheduling towards smart assembly systems
HF Rahman, MN Janardhanan, P Nielsen
Assembly Automation, 2020
202020
Mathematical models and migrating birds optimization for robotic U-shaped assembly line balancing problem
Z Li, MN Janardhanan, AS Ashour, N Dey
Neural Computing and Applications 31 (12), 9095-9111, 2019
192019
Real-time order acceptance and scheduling problems in a flow shop environment using hybrid GA-PSO algorithm
HF Rahman, MN Janardhanan, IE Nielsen
IEEE Access 7, 112742-112755, 2019
192019
Material supply scheduling in a ubiquitous manufacturing system
I Nielsen, NAD Do, ZA Banaszak, MN Janardhanan
Robotics and Computer-Integrated Manufacturing 45, 21-33, 2017
192017
Redesign of an in-market food processor for manufacturing cost reduction using DFMA methodology
A Harlalka, CD Naiju, MN Janardhanan, I Nielsen
Production & Manufacturing Research 4 (1), 209-227, 2016
192016
The system can't perform the operation now. Try again later.
Articles 1–20