Follow
Franco Cheung
Title
Cited by
Cited by
Year
Early stage multi-level cost estimation for schematic BIM models
FKT Cheung, J Rihan, J Tah, D Duce, E Kurul
Automation in construction 27, 67-77, 2012
2162012
BIM in off-site manufacturing for buildings
FH Abanda, JHM Tah, FKT Cheung
Journal of building engineering 14, 89-102, 2017
1972017
Multi-criteria evaluation model for the selection of architectural consultants
FKT Cheung, JLF Kuen, M Skitmore
Construction Management & Economics 20 (7), 569-580, 2002
1552002
A framework for the utilization of Building Management System data in building information models for building design and operation
AH Oti, E Kurul, F Cheung, JHM Tah
Automation in Construction 72, 195-210, 2016
1212016
Mathematical modeling of embodied energy, greenhouse gases, waste, Time-Cost parameters of building projects: A Review
FH Abanda, JHM Tah, FKT Cheung
Building and Environment 59, 23-37, 2013
1002013
Application of cross validation techniques for modelling construction costs during the very early design stage
FKT Cheung, M Skitmore
Building and environment 41 (12), 1973-1990, 2006
352006
Demystifying the concept of offsite manufacturing method: Towards a robust definition and classification system
KO Ayinla, F Cheung, AR Tawil
Construction innovation 20 (2), 223-246, 2020
322020
Rethinking the build process for BIM adoption
E Kurul, H Abanda, J Tah, F Cheung
CIB World Building Congress Construction and Society. Australia, 2013
272013
Exploring the relationships between linked open data and building information modelling
FH Abanda, W Zhou, JHM Tah, F Cheung
Sustainable Building Conference, 176-185, 2013
232013
A study of clients' and estimators' tolerance towards estimating errors
FKT Cheung, MWL Wong, M Skitmore
Construction Management and Economics 26 (4), 349-362, 2008
232008
Measuring the embodied energy, waste, CO2 emissions, time and cost for building design and construction
H Abanda, JHM Tah, F Cheung, W Zhou
Computing in Civil and Building Engineering, Proc., Int. Conf., Jun, 2010
142010
Does the UK built environment sector have the institutional capacity to deliver sustainable development?
E Kurul, JHM Tah, F Cheung
Architectural Engineering and Design Management 8 (1), 42-54, 2012
132012
ifcOWL-DfMA a new ontology for the offsite construction domain
EV Kalemi, F Cheung, ARH Tawil, P Patlakas, K Alyania
LDAC 2020-Proceedings of the 8th Linked Data in Architecture and …, 2020
122020
A modified storey enclosure model
FKT Cheung, M Skitmore
Construction Management and Economics 24 (4), 391-405, 2006
122006
The utilization of BMS in BIM for facility management
A Oti, E Kurul, F Cheung, J Tah
Proceedings of the CIB World Building Congress, Tampere, Finland 30, 2016
102016
Towards a holistic modelling framework for embodied carbon and waste in the building lifecycle
JHM Tah, W Zhou, FH Abanda, FKT Cheung
University of Nottingham, 2010
92010
Explorations in specifying construction price forecast loss functions
M Skitmore, FKT Cheung
Construction Management and Economics 25 (5), 449-465, 2007
82007
A semantic offsite construction digital Twin-Offsite Manufacturing Production Workflow (OPW) ontology
K Ayinla, E Vakaj, F Cheung, ARH Tawil
second international workshop on semantic digital twins, 2021
72021
A case study of hybrid strategies to create value for a contracting business in the education sector in England and Wales
FKT Cheung, E Kurul, AH Oti
Construction Management and Economics 34 (4-5), 335-352, 2016
62016
Process Waste Analysis for Offsite Production Methods for House Construction: A Case Study of Factory Wall Panel Production
K Ayinla, F Cheung, M Skitmore
Journal of Construction Engineering and Management 148 (1), 05021011, 2022
32022
The system can't perform the operation now. Try again later.
Articles 1–20